a broken arrow...
A view of tunnelling equipment at the North portal of the North-South Bypass Tunnel in Brisbane. At 6.8 km in length, the tunnel passes under the Brisbane river and its construction should be finished two years from now in 2010.
A view of tunnelling equipment at the North portal of the North-South Bypass Tunnel in Brisbane. At 6.8 km in length, the tunnel passes under the Brisbane river and its construction should be finished two years from now in 2010.